Make-to-order is a production strategy in which the customer’s order is not manufactured until the order is received, which allows customisation to the exact specifications the customer requires.1

An open operations management text says the strategy may also be called build-to-order and describes it as a pull system, in which work is pulled through the process when customer demand is present.1 Its disadvantage is time: the firm must acquire materials and components, then schedule and produce the order.1 Its advantage is that inventory is lower than in a typical make-to-stock system, with no uncertainty about what the customer wants and no obsolete stock to dispose of.1

A second open text says the strategy is still commonly used by print or sign shops that produce low-volume, high-variety goods to customer specification, and that this level of customisation often results in a longer production and delivery cycle than other approaches.2 An MIT capstone calls it ideal for customised or low-volume products, minimising inventory costs but often resulting in longer lead times and planning complexity.3

Scope and distinctions

Make-to-order sits at the order-driven end of the spectrum described at Production Strategy; its counterpart is Make-to-Stock. Where the product is designed only after the order, see Engineer-to-Order. A trade glossary calls assemble-to-order a faster subset of make-to-order, because stocked components move the decoupling point down to final assembly; see Assemble-to-Order.4

A queueing paper notes that make-to-order systems offer more expensive products owing to the higher variety of customisation, and raises concerns about average order delay, response time and due date setting.5 The same paper studies a mixed arrangement in which semi-finished products are completed to stock when no customer is waiting and assigned to an order when one arrives.5

What the sources do not establish

No source gives figures for the lead time penalty, so the page does not, and none of them fixes where in the process make-to-order must begin.

Footnotes

  1. Engineering LibreTexts (Introduction to Operations Management, 1st Ed.), “6.2: Make-to-order and Make-to-stock”. https://eng.libretexts.org/Under_Construction/Purgatory/Introduction_to_Operations_Management_1st_Ed./06:_Process_Design/6.02:_Make-to-order_and_Make-to-stock ↩ ↩2 ↩3 ↩4

  2. eCampusOntario Pressbooks (Introduction to Canadian Business), “Operations Management”. https://ecampusontario.pressbooks.pub/bus108g/chapter/opsmanagement/ ↩

  3. MIT Center for Transportation and Logistics (Pooja Kashyap, capstone), “Optimizing Hybrid Assembly Strategies in Supply Networks: Evaluation of Make-to-Stock and Make-to-Order Models”. https://ctl.mit.edu/sites/default/files/documents/optimizing-hybrid-assembly-strategies-in-supply-networks-evaluation-of-make-to-stock-and-make-to-order-models-capstone.pdf ↩

  4. ERP Research, “What is ATO (Assemble-to-Order)? — ERP Glossary”. https://erpresearch.com/glossary/assemble-to-order ↩

  5. Production (Associação Brasileira de Engenharia de Produção), Ghalehkhondabi and Suer, via Redalyc, “Production line performance analysis within a MTS/MTO manufacturing framework: a queueing theory approach”. https://www.redalyc.org/journal/3967/396754754007/html/ ↩ ↩2